Applications: For installing all types of ceramic tiles, clinker tiles, and natural stone indoors and outdoors, in dry and damp areas. Also suitable for heated floors. Substrate Type Stable walls and floors with minimal deformation, such as plastered brick, stone walls, gypsum boards, concrete elements, and lightweight concrete elements with minimal volume expansion. Substrate Preparation The substrate must be load-bearing, stable, free of cracks, and clean of dust, grease, and cement slurry. The surface must be dry enough for the mira 4180 primer to be absorbed. Prime absorbent surfaces with 4180 primer, and waterproof damp areas in accordance with ETAG 022 regulations and mira’s instructions. For best results, mix with a concrete mixer. The powder, water, and substrate must be within the recommended working temperature range. The tile adhesive must be used within 6 hours of mixing. It is not recommended to apply the mixture to larger surfaces than can be covered with tiles before the skin forms.
Apply 3110 Unifix to the surface using the straight edge of a notched trowel, then comb through with the serrated edge. Select the notched trowel according to the tile type. Press the tiles into the wet mortar. Ensure that the back of the tile is completely covered with the mortar. Surfaces larger than 36 m² or with sides longer than 8 m are typically divided into separate work sections throughout the entire structure.
Depending on the absorbency of the tiles and the room temperature, the surface will be ready for further treatment in approximately 10 hours on walls and 18 hours on floors. Application: For best results, mix with a mixer. The powder, water, and
substrate must be within the recommended working temperature range.
The tile adhesive must be used within 6 hours after mixing.
It is not recommended to apply the mixture to large areas unless the tiles can be laid before a skin forms. Apply 3130 Superfix to the surface and spread it out with the straight edge
of a trowel, then comb through with the notched edge. Select the trowel according to the tile type. Press the tiles into the wet mixture. Ensure that the back of the tile is completely covered with the mixture. Surfaces larger than 36 m² or with sides longer than 8 m
are typically divided into separate work sections throughout the entire structure.
Depending on the absorbency of the tiles and the room temperature, the surface will be ready for further treatment in about 10 hours on walls and 18 hours on floors.