Mira 6700 Cemplan is a cement-based, polymer-reinforced floor leveling compound. Suitable for pouring a leveling layer over concrete, screed, and lightweight concrete. A dry mix that is ready for use after mixing with water. Self-leveling and easy to smooth.
Applications
: For pouring leveling layers in damp and dry rooms. The mix can be applied by hand or pumped.
Substrate
Suitable for use on concrete, screed, and lightweight concrete. On concrete and screed, the recommended layer thickness is 1–45 mm. On lightweight concrete, 5–30 mm.
Substrate Preparation
The substrate must be dry, sound, and free of grease, dust, and other contaminants. Remove cement slurry, loose particles, and weak spots, and repair the surface. Use Mira 7110 Base Cleaner to clean the substrate.
Priming:
Prime concrete surfaces using Mira 4180 Primer. Depending on the porosity of the substrate, dilute the primer with 1–3 parts water. Prime non-porous surfaces with Mira 4140 Contact Primer. Apply the primer to the surface with a brush and work it in. When pouring in multiple layers, the surface must be primed anew each time.
Application:
Mix 25 kg of powder with 4.75–5.25 liters of clean water. For best results, use a mixer or pump. Mix for 2 minutes until a homogeneous mass is formed. Check the flowability using a flow test. Place a test ring filled to the brim with the mixture on a smooth surface, then remove the ring so that the mixture flows freely. Once the mixture has set, measure the diameter. The mixture is usable for 15 to 20 minutes after mixing at a temperature of 10–20°C. The mixture is self-leveling; use a trowel to assist with leveling in the corners. Depending on room temperature and humidity, the surface is ready for light traffic after 2 hours. Further surface treatment may begin after 6–12 hours. In damp rooms, apply the Mira 4400 Multicoat system as a waterproofing barrier after 12–18 hours.
• Coating thickness: 1–45 mm
• Coverage: 1.7 kg/m² per 1 mm layer
• Working time: 15–20 min
• Working time: 30 min
• Recommended application temperature: 10–20 °C
• Drying time: 2 h for light traffic; 6–12 h for further processing